Excavated internally and vibratory PHC pipe pile
2021-06-08
The equipment required for excavated internally and vibratory PHC pipe pile method include: (1) A set of free-resonance medium hole vibratory Hammer (2) A set of medium Hole Steel Tube clamping (3) Long spiral drilling rig and drill pipe set (4) A se...