标题
E-mail: sales@en.ep-piling.com
 Web: www.ep-piling.com

icon08 HOME > NEWS
EP320 resonance-free vibrating hammer Zhejiang Hangzhou Shaoyong project steel protection tube
2021-09-26
Construction background 1. The steel protective tube (diameter 2m, length 15m) has been put into the soil for nearly half a year, and there is a slope difference of nearly 50 cm; 2. The steel protective tube is located beside the river on the side of...
Multi-hammer linkage technology "grouping" helps marine engineering construction
2021-09-26
With the rapid development of wind power technology, offshore wind power has become the focus of the world's renewable energy development. In recent years, my country’s offshore wind power industry has developed rapidly, and the newly-added offshore ...
Offshore wind power internal support pile hanger set sail smoothly
2021-09-26
Leading green development "Carbon neutrality" is a national strategic development direction during the "14th Five-Year Plan" period and even in the future. As the scale of domestic offshore wind power construction continues to accelerate, the constru...
EP1600 resonance-free vibration hammer helps Zhanjiang Xuwen offshore wind farm
2021-08-10
Recently, our company's EP1600 resonance-free vibratory hammer has been successfully started in the Zhanjiang Xuwen offshore wind power project. The inclined piles of the offshore wind power booster station platform foundation project with an inclina...
  • 1
  • 2
  • 3
  • ...
  • 13
首页 Created with Sketch. Home
邮箱1 Created with Sketch. E-mail
电话 Created with Sketch. Tel
Get in touch

Cao peng: +86 021 5828 4568 

                  +86 186 1653 7820 

Yan Jiadan:+86 021 5828 4568

+86 150 0055 8033

Fax: +86 021 5828 4568

Web: www.ep-piling.com
E-mail: sales@en.ep-piling.com

Add: No.2518 Jiangshan Road,Pudong new District, Shanghai,China

PRODUCTS

EP resonance-free vibratory hammer
YZPJ hydraulic vibratory hammer
DTH hammer rock drilling machine
DZP electrical vibratory hammer
KLV sand/gravel pile vibratory hammer
Clamping Jaw
JU pile driving rig
JUZ hydraulic long auger drilling rig
Method
Link
  • 电话 Created with Sketch.

    +86 186 1653 7820 

  • 邮箱1 Created with Sketch.

    E-mail: sales@en.ep-piling.com

  • 返回顶部2 Created with Sketch.


Copyright ©2007-2021 Shanghai zhenzhong construction machinery technology Co., Ltd

Privacy Policy
Terms and Conditions